Septic Terms and Conditionsadmin2026-01-29T11:30:59-05:00 Septic Terms and Conditions Acknowledgement Recipient Information Name * Name First Name First Name Last Name Last Name Email * Phone * Document or Item Details Document Title * JOB NUMBER * Description * This document describes the terms and conditions required before septic work begins. JOHNNY BLUE INC. – TERMS AND CONDITIONS for SEPTIC WORK Johnny Blue Incorporated shall not be responsible for pre-existing defects or failures that are discovered under any conditions. Johnny Blue Incorporated’s liability, if any, for performance hereunder shall be limited to the agreement, price, with respect to any labor and materials supplied due to the authorized repairs or replacement of deficiencies identified. Johnny Blue Incorporated warrants the services against labor or material defect for the term of one year. Johnny Blue Incorporated does not warranty or extend or modify any manufacturer’s warranty. The Contractor warrants to the Owner that materials and equipment furnished under the agreement will be of good quality and new unless otherwise required or permitted by the Construction Agreement, that the work will be free from defects not inherent in the quality required or permitted. Johnny Blue Incorporated is not responsible for damage to landscaping (i.e.: trees, shrubs, plants, turf, grass) or hardscape (i.e.: concrete slabs, asphalt). When contracted to patch hardscape or masonry areas, matching texture and color is not guaranteed. Land clearing is not included in this proposal.Backfill will be lightly compacted and slightly above grade to control settling and run off. Johnny Blue Incorporated shall not be held liable for delays, events or circumstances beyond reasonable control, including acts of God or Government, strike, war, pandemic, accidents, fire, transportation delays, shortage of material or labor. All material to be specified and all work to be completed in a manner consistent with standard industry practice. ROCK CLAUSE: If additional significant concealed conditions are discovered once work has commenced which were not visible at the time this estimate was made, the Contractor will stop work and point out these unforeseen concealed conditions to the Owner for approval of the additional work. All items are special order and cannot be changed once in production and also that special order items cannot be returned. The work hours for Johnny Blue Incorporated’s personnel and subcontractors are 7AM – 4PM, Monday – Friday. The Owner shall provide the Contractor with access to the building and construction site for the duration of the project. This must be sufficient for access to all materials or equipment necessary for the completion of the project, for storage of the materials or equipment, and for staging areas for fabrication and mixing of materials. The Client is responsible for compensating Johnny Blue Incorporated in full for all costs, expenses and legal fees incurred because of collection efforts on past due payments. In addition, until payment is made in full, Johnny Blue Incorporated will retain the title to all equipment and material furnished to the customer. Customer shall allow access to remove equipment and materials and the Contractor is not held responsible for the cost of any damage caused by removal. The contractor shall be solely responsible for and have control over construction means, methods, techniques, sequences and procedures, and for coordinating all portions of the work under the contract agreement. The Contractor’s liability insurance shall be comprehensive general and automobile, bodily injury and property damage policy or policies written for not less than $1,000,000 for each occurrence and $2,000,000 aggregate. Auto liability insurance limits shall be $1,000,000 per occurrence. The Owner shall purchase and maintain the Owner’s usual property liability insurance. The Owner shall include in their insurance policy that the insured will waive subrogation against Johnny Blue Incorporated. Contractor’s right to photograph the work: The Owner shall permit the Contractor or person(s) employed or engaged by the Contractor, without compensation or consideration to Owner, to take photographs at the project site of both completed work and work in progress. Such photographs and any accompanying descriptions shall not identify the Owner or the property address of the project without the express written consent of the Owner. The Owner shall contact Miss Utility and provide water and electricity to the Contractor for the performance of their work. The Owner shall be responsible for all permits and inspections for Daywork items and this agreement. The Owner shall be responsible for the removal of fence, articles and furnishings from the affected areas of construction prior to the work. The Owner shall maintain property insurance for the project to its full insurable value. The Contractor will provide Workmen’s Compensation Insurance as required by state law. SUBMITTED BY: Kristen Bush, CEO CLASS A CONTRACTOR LIC # 2705186943 DPOR LIC#1944002346 I HAVE REVIEWED THE QUANTITIES AND SPECIFICATIONS OF THE MATERIAL AND WORK PROPOSED HEREIN AND APPROVE Johnny Blue Incorporated TO PROCEED WITH THE PROJECT. Required inspections are every 12 months. Pumping every 3-5 years depending on the usage. Terms: DUE UPON COMPLETION. Late fees will apply. The above prices, specifications and other conditions are hereby accepted. Pricing is good for 60 DAYS from the date of signature. Acknowledgement Statement * I acknowledge that I have received and understood the contents and purpose of the document described above. I understand that it is my responsibility to read and follow the terms and conditions listed in the document described above. Signature * signature keyboard Clear Date * Submit If you are human, leave this field blank.